Southeast Upper Salt Creek Watershed Stormwater Master Plan
October 2003
Documents in PDF format.

show all sectionscollapse all sections
Cover and Table of Contents (165 K)
Executive Summary (42 K)
Section I - Basin Evaluation (861 K)
Section II - Master Plan (850 K)
Appendices
- Appendix A - Public Involvement Meetings (1.09 M)
- Appendix B - Constraints of Habitat and Channel Stability on the Development of Drainage Improvement Alternatives for the S-1, S-2/S-3 and Portion of S-5 Urban Planning Zones and the N-1, N-2, N-3, N-4, and N-5 Urban Planning Zones (3.28 M)
- Appendix C - HEC-1 Summary Printouts for 1-, 2-, 5-, 10-, 25-, 50-, 100-, and 500-year Storms for Existing, Built-out, and LLCCP Projected Land Use Conditions (220 K)
- Appendix D - HEC-1 Summary Printouts for 1-, 2-, 5-, 10-, 25-, 50-, 100-, and 500-year Storms for Concept Master Plan A and Concept Master Plan B (114 K)
Figures
Section I – Basin Evaluation
- I-1 Area Map (657 K)
- I-2 Watershed Boundary Map (422 K)
- I-3 Existing Land Use and Zoning Map (268 K)
- I-4 2025 Future Land Use Plan (222 K)
- I-5 Soil Associations Map (161 K)
- I-6 Hydrologic Soil Groups (1.16 M)
- I-7 Hydrologic Parameters - Existing Conditions (398 K)
- I-8 HEC-1 Model Schematic (89 K)
- I-9 Hydrologic Parameters - Projected Conditions (412 K)
- I-10 Flood Prone Area Map - Existing Conditions (647 K)
- I-11A..o Plan View of Stream Segments 1 through 15 (2.46 M)
- I-12A..o Flood Profiles Stream Segments 1 through 15 (1.35 M)
- I-13 Flood Hazard - Existing Conditions (686 K)
Section II – Master Plan
- MP-1 Allowable Velocities (850 K)
- MP-2 Bank Stability Chart (850 K)
- MP-3 Channel Scour Threat - Floodplain Preserved (1.07 M)
- MP-4 Channel Scour Threat - Minimum Corridor Preserved (1.08 M)
- MP-5 Example Bioengineering Approaches (850 K)
- MP-6 Bioengineering Concept Alternatives (850 K)
- MP-7 Riprap Grade Check Structure (850 K)
- MP-8 Potential Preserved Existing 100-Year Floodplain (1.24 M)
- MP-9 Potential 400-Foot Flood Corridor (1.23 M)
- MP-10 Typical Constructed Wetland Cross-Section (850 K)
- MP-11 Potential Constructed Water Quality Wetland Locations (1.23 M)
- MP-12 Potential Public Bridge and Culvert Improvement Locations (1.24 M)
- MP-13 Typical Structure Cross-Sections (33 K)
- MP-14 Potential Regional Stormwater Storage Facility Locations (1.23 M)
- MP-15 Potential Site “A” Regional Detention Plan View (1.98 M)
- MP-16 Potential Site “B” Regional Detention Plan View (1.94 M)
- MP-17 Potential Stormwater Storage Facilities Sites S-201, S-202 & S-2AF (2.03 M)
- MP-18 Potential Stormwater Storage Facilities Sites S-5B & S-5E (1.72 M)
- MP-19 Potential Stormwater Storage Facility Typical Cross-Section (48 K)
- MP-20 Concept Master Plan A Potential Component Locations (339 K)
- MP-21 Concept Master Plan B Potential Component Locations (334 K)
- MP-22A..o Proposed Concept Master Plan Components Stream Segments 1 through 15 (1.91 M)
- MP-23A..o Proposed 100-yr Water Surface Profiles Stream Segments 1 through 15 (2.59 M)
Tables
Executive Summary
- ES-1 2-year Peak Flow Rate Values at Selected Locations
- ES-2 10-year Peak Flow Rate Values at Selected Locations
- ES-3 100-year Peak Flow Rate Values at Selected Locations
- ES-4 SEUSC Master Plan Performance Matrix
Section I – Basin Evaluation
- I-1 Summary of 2001 Land Use in the UPZ S-1, S-2/S-3, & Portion of S-5 Watershed
- I-2a Development in the UPZ S-1 Watershed
- I-2b Development in the UPZ S-2/S-3 Watershed
- I-2c Development in Portion of UPZ S-5 Watershed
- I-3 Comparison of Soil Associations Found in the Watershed
- I-4 Soil Legend and Hydrologic Soil Group (HSG)
- I-5a Hydrologic Parameters for UPZ S-1 in Southeast Upper Salt Creek Watershed
- I-5b Hydrologic Parameters for UPZ S-2/S-3 in Southeast Upper Salt Creek Watershed
- I-5c Hydrologic Parameters for Portion of UPZ S-5 in Southeast Upper Salt Creek Watershed
- I-6 Pond Characteristics
- I-7 Total 24-hour Precipitation
- I-8a Existing Road Crossing Data Summary for UPZ S-1
- I-8b Existing Road Crossing Data Summary for UPZ S-2/S-3
- I-8c Existing Road Crossing Data Summary for Portion of UPZ S-5
- I-9a Peak Flow Rate Values at Selected Locations on the Mainstem EXISTING CONDITIONS in UPZ S-1
- I-9b Peak Flow Rate Values at Selected Locations on the Mainstem EXISTING CONDITIONS in UPZ S-2/S-3
- I-9c Peak Flow Rate Values at Selected Locations on the Mainstem PROJECTED CONDITIONS in UPZ S-2/S-3
- I-9d Peak Flow Rate Values at Selected Locations on the Mainstem EXISTING CONDITIONS in Portion of UPZ S-5
- I-9e Peak Flow Rate Values at Selected Locations on the Mainstem PROJECTED CONDITIONS in Portion of UPZ S-5
- I-10 2-year Peak Flow Rate Values at Selected Locations in UPZ S-2/S-3
- I-11 10-year Peak Flow Rate Values at Selected Locations in UPZ S-2/S-3
- I-12 100-year Peak Flow Rate Values at Selected Locations in UPZ S-2/S-3
- I-13a 2-year Peak Flow Rate Values at Selected Locations in portion of UPZ S-5
- I-13b 10-year Peak Flow Rate Values at Selected Locations in portion of UPZ S-5
- I-13c 100-year Peak Flow Rate Values at Selected Locations in portion of UPZ S-5
- I-14a Comparison of Road Crossing Capacity Mainstem Channel for UPZ S-1
- I-14b Comparison of Road Crossing Capacity Mainstem Channel for UPZ S-2/S-3
- I-14c Comparison of Road Crossing Capacity Tributary Channels for UPZ S-2/S-3
- I-15 Future Conditions Peak Flow Rate Values at Selected Locations with Existing Conditions Geometry in UPZ S-2/S-3 & Portion of UPZ S-5
Section II – Master Plan
- MP-1 Stormwater Master Plan Decision Matrix
- MP-2 Stream Geomorphological Data
- MP-3 Bioengineering Component Matrix
- MP-4 Opinion of Probable Cost for Bioengineering Concept Alternatives
- MP-5 2-Year Peak Flow Rate Values at Selected Locations
- MP-6 10-Year Peak Flow Rate Values at Selected Locations
- MP-7 100-Year Peak Flow Rate Values at Selected Locations
- MP-8 Land Requirements for Floodplain Preservation Components
- MP-9 Annual Flood Insurance Rates (2002)
- MP-10 Selected Urban Pollutant Loading
- MP-11 Average Annual Pollutant Removal Capability of Wetlands
- MP-12a Approximate Pollutant Removal Performance of Constructed Wetland with 100-Year Existing Floodplain
- MP-12b Approximate Pollutant Removal Performance of Constructed Wetland with 400-Foot Flood Corridor
- MP-13 Comparison of Pollutant Removal Efficiency of Examples 1 and 2
- MP-14a Opinion of Probable Costs for Constructed Water Quality Wetland FP
- MP-14b Opinion of Probable Costs for Constructed Water Quality Wetland 400'
- MP-15 Opinion of Probable Costs for Proposed Bridge and Culvert Improvements Mainstem and Tributaries
- MP-16 Potential Stormwater Storage Facility Data
- MP-17 2-Year Peak Flow Rate Values at Selected Locations
- MP-18 10-Year Peak Flow Rate Values at Selected Locations
- MP-19 100-Year Peak Flow Rate Values at Selected Locations
- MP-20 2-Year Peak Flow Rate Values at Selected Locations
- MP-21 10-Year Peak Flow Rate Values at Selected Locations
- MP-22 100-Year Peak Flow Rate Values at Selected Locations
- MP-23 SEUSC Master Plan Performance Matrix