Beal Slough Stormwater Management Plan
May 2000
Documents in PDF format.
show all sectionscollapse all sections
Cover and Table of Contents (348 K)
Executive Summary (693 K)
Section I – Basin Evaluation (3.37 M)
Section II – Master Plan (7.74 M)
Bibliography (30 K)
Appendices
- Appendix A – Master Plan Conditions Runoff Summary for 2-year, 10-year, and 100-year Frequency Events (514 K)
- Appendix B – Figures VI-1 through VI-11 from the Interim Basin Report (4.1 M)
- Appendix C – Comparison of Lincoln Stormwater Quality Data with National Urban & Denver Metropolitan Data (528 K)
- Appendix D – Biological Assessment of Beal Slough (2.06 M)
- Appendix E – Minor Storm Drain System Analysis (405 K)
Tables
Executive Summary
- ES-1 Subarea Target Peak Flow Rates for 2-, 10-, and 100-year Storms
- ES-2a Target Peak Flow Rates at Selected Locations on the Mainstem
- ES-2b Target Peak Flow Rates at Selected Locations on the Mainstem
- ES-3 Preliminary Opinion of Approximate Cost for Major Capital Components
Section I – Basin Evaluation
- I-1 Hydrologic Parameters of the Basin
- I-2 Summary of 1997 Land Use in the Beal Slough Watershed
- I-3 Development in the Watershed
- I-4 Comparison of Soil Associations Found in the Watershed
- I-5 Soil Legend and Hydrologic Soil Group
- I-6 Pond Characteristics
- I-7 Beal Slough Historic Storm Distribution
- I-8 Beal Slough 24-hour Type II Storm Distribution
- I-9 Drainage Subbasin Characteristics
- I-10 100-year Peak Flow Rate Comparison of 1997 to FIS Values
- I-11 Annual Pollutant Loads Estimated from 1992 Monitoring Results
- I-12 Inventory of Industrial Facilities
- I-13 Monitoring Site Description
- I-14 Results of Chemical Analysis
- I-15 Comparison of Beal Slough Sampled Data to NURP Data
- I-16a Comparison of Bridge Capacity Mainstem Channel
- I-16b Comparison of Bridge Capacity Tributary Channels
- I-17a Comparison of Stream Reach Capacity Mainstem Channel
- I-17b Comparison of Stream Reach Capacity Tributary Channels
- I-18 Visual HEC-1 Reach and HEC-RAS Cross-section Labeling Key
Section II – Master Plan
- MP-1 Target Peak Flow Rates at Selected Locations on the Mainstem
- MP-2 Target Peak Flow Rates at Selected Locations on the Tributaries
- MP-3 Subarea Target Peak Flow Rates for 2-, 10-, and 100-year Storms
- MP-4 2-year Peak Flow Rate Comparison of 1997 Conditions to Master Plan Conditions
- MP-5 Preliminary Opinion of Approximate Cost for Major Capital Components
Figures
Executive Summary
- ES-1 Pattern of Development Map
- ES-2 Basin Map
- ES-3 Growth in Peak Flow Rates
- ES-4 Master Plan Major Capital Cost Components
- ES-5 Master Plan Improvement in Peak Flow Rates
Section I – Basin Evaluation
- I-1 Locator Map
- I-2 Basin Map
- I-3 Land Use
- I-4 Future Land Use
- I-5 Existing Soil Types
- I-6 SCS Hydrologic Soil Groups
- I-7 Visual HEC-1 Schematic of Beal Slough Master Plan Model
- I-8 1997 Land Use Map
- I-9 Future Hydrologic Conditions
- I-10 NPDES Stormwater Monitoring Site Location Map
- I-11 Photographic Key Map
- I-12 Channel Cross-section Comparison Between FIS 1978 and 1998 Channel
Section II – Master Plan
- MP-1 Master Plan - Major Capital Cost Components
- MP-2 Master Plan Improvements in Peak Flow Rates
- MP-3 Stream Segment Figure Key Map
- SG1-PC Stream Segment 1 Components - Salt Creek to 14th Street
- SG1-FP Stream Segment 1 Plan and Profile - Salt Creek to 14th Street
- SG1-CD1 Stream Segment 1 & 2 - Tieback Levee Concepts
- SG2-PC Stream Segment 2 Components - 14th Street to 27th Street
- SG2-FP Stream Segment 2 Plan and Profile - 14th Street to 27th Street
- SG2-CD1 Stream Segment 2 - Channel Concepts
- SG2-CD2 Stream Segment 2 - Water Quality Wetlands Concept
- SG3-PC Stream Segment 3 Components - 27th Street to (3800E) Highway 2
- SG3-FP Stream Segment 3 Plan and Profile - 27th Street to (3800E) Highway 2
- SG3-CD1 Stream Segment 3 - Tierra Park Off-channel Storage Facility near Tierra Drive Concepts
- SG3-CD2 Stream Segment 3 - Concept Off-Channel Storage Facility near 38th Street
- SG3-CD3 Stream Segment 3 - Storage Concept Sections
- SG3-CD4 Stream Segment 3 - Channel Stability Concept
- SG4-PC Stream Segment 4 Components - (3800E) Highway 2 to (5200E) Highway 2
- SG4-FP Stream Segment 4 Plan and Profile - (3800E) Highway 2 to (5200E) Highway 2
- SG4-CD1 Stream Segment 4 - Concepts
- SG5-PC Stream Segment 5 Components - (5200E) Highway 2 to Old Cheney Road
- SG5-FP Stream Segment 5 Plan and Profile - (5200E) Highway 2 to Old Cheney Road
- SG6-PC Stream Segment 6 Components - Old Cheney Road to Pine Lake Road
- SG6-FP Stream Segment 6 Plan and Profile - Old Cheney Road to Pine Lake Road
- SG7-PC Stream Segment 7 Components - Pine Lake Road to 70th Street
- SG7-FP Stream Segment 7 Plan and Profile - Pine Lake Road to 70th Street
- SG7-CD1 Stream Segment 7 - Training Dike Concept
- SG8-PC Stream Segment 8 Components - 70th Street to 84th Street
- SG8-FP Stream Segment 8 Plan and Profile - 70th Street to 84th Street
- SG9-PC Stream Segment 16 Components -70th Street Tributary
- SG9-FP Stream Segment 16 Plan and Profile - 70th Street Tributary
- SG10-PC Stream Segment 15 Components - Pine Lake Tributary
- SG10-FP Stream Segment 15 Plan and Profile - Pine Lake Tributary
- SG11-PC Stream Segment 14 Components - Highway 2 to 56th Street Tributary
- SG11-FP Stream Segment 14 Plan and Profile - Highway 2 to 56th Street Tributary
- SG12-PC Stream Segment 13 Components - Highway 2 to 56th Street Tributary
- SG12-FP Stream Segment 13 Plan and Profile - Highway 2 to 56th Street Tributary
- SG13-PC Stream Segment 9 Components - Tierra Branch, Beal Slough to 34th Street Tributary
- SG13-FP Stream Segment 9 Plan and Profile - Tierra Branch, Beal Slough to 34th Street Tributary
- SG14-PC Stream Segment 11 Components - Tierra Branch, 34th Street to Pine Lake Road Tributary
- SG14-FP Stream Segment 11 Plan and Profile - Tierra Branch, 34th Street to Pine Lake Road Tributary
- SG15-PC Stream Segment 10 Components - Tierra Branch, Tributary
- SG15-FP Stream Segment 10 Plan and Profile - Tierra Branch, Tributary
- SG16-PC Stream Segment 12 Components - King Arthur Court Tributary
- SG16-FP Stream Segment 12 Plan and Profile - King Arthur Court Tributary